Start

12 Offers were Submitted for the Construction of another Section of Struma Motorway through the Kresna Gorge

19.02.2019 16:15
Struma_LOT_3.2.bg.jpgThe offers under the public procurement procedure for the selection of a contractor for the design and construction of lot 3.2.2, or another 10,4 km of Struma Motorway in the Kresna – Krupnik section, were opened. This is the carriageway from Kulata to Sofia, which will pass on the eastern side of the Kresna Gorge along a new route. The entire section from Kresna to Krupnik, which is approximately 24 kilometers long, is divided into two lots – lot 3.2.1 and lot 3.2.2, thus allowing the works on the site to be carried out simultaneously in order the project to be completed within the time framework of the Operational Programme „Transport and Transport Infrastructure “.  

Ten Offers for the Construction of a Section of Struma Motorway through the Kresna Gorge

15.02.2019 16:26
MAP_Struma_LOT_3_2_svarzanost.jpgTen offers were opened under the public procurement procedure for the selection of a contractor for the design and construction of 13,2 km of Struma Motorway, in the Kresna – Krupnik section. This is the carriageway from Kulata to Sofia, which will pass on the eastern side of the Kresna Gorge along a new alignment.   The entire section from Kresna to Krupnik, which is approximately 24 km long, is divided in two lots – Lot 3.2.1 and Lot 3.2.2, thus allowing the works on the site to be carried out simultaneously in order the project to be completed within the time framework of the Operational Programme until 2023.

The Contract for Design and Construction of Zheleznitsa Tunnel on Struma Motorway has been Signed

12.02.2019 11:26
Lot_3.1_AM_Struma_Tunel_Jeleznitsa.jpgThe contract for design and construction of Zheleznitsa Tunnel on Struma Motorway has been signed. The facility will have a length of about 2 km and will be the longest road tunnel, built in Bulgaria so far. The contract was awarded to DZZD „AM STRUMA TUNNEL 2018“, in which participate: „GP GROUP“ AD, „GLOBAL CONSTRUCTION“ OOD and „VIA PLAN“ EOOD. The value of the contract amounts to BGN 185 370 370, 37, exclusive of VAT. The project will be co-financed by the European Union Cohesion Fund and the national budget through the Operational Programme “Transport and Transport Infrastructure” 2014-2020.  

Six are the Open Bids for the Construction of a Section of the Mezdra – Botevgrad Road

04.02.2019 16:55
Mezdra_Botevgrad.jpgSix bids were opened of participants in the public procurement procedure for the selection of a contractor for additional design and construction of 13.4 km of road I-1 (E-79) Mezdra – Botevgrad, Lot 2 from km 161+367 to km 174+800. The construction of the Vidin – Botevgrad road will start from one of the most complicated sections as a crossing area. As a result, the construction of 33 km of the road between Mezdra and Botevgrad is divided in two lots – Lot 1 (19.3 km) and Lot 2 (13.4 km). The objective is to complete the section within a short period of time.
« предишни123456...36следващи »